Thursday, April 17, 2014
last work for awhile
No picture progress today but lots of things got done. The drywall cracks in the living room are finished and today the final coat of paint was applied and looking good so we now are able to put that room back like it was. Several things in the kitchen were finalized but now we have to wait until the granite counter tops are cut and installed before we can continue with backsplash tile and final trim. They say it could be two weeks so we will make do without a kitchen sink and dishwasher. We are able to make use of the stove, new microwave, and fridge. We will be able to start filling the new cabinets except for a couple that need to be left open for the final touches. Jo has already emptied a couple of boxes that we used to store things.