Friday, April 11, 2014

end of the first week

Almost all of the base cabinets are set in place.  The only piece not set is a stand-alone base cabinet between the bar and the patio door.  This one will replace a desk that we had there and will provide some storage under the counter top.  The other item not installed is the wine rack which was supposed to be connected to the upper cabinets.  It has to be refinished to match the rest of our cabinetry.  We will have this weekend to work with the current condition and then next Tuesday the counter top folks are to come measure for our granite so they are sure to make it fit perfectly.  It will take one to two weeks for that to be cut before it can be installed.  The dishwasher and over-the-range microwave will be delivered next Wednesday.  After the counter top is installed we will have to pick out our back splash tile.

Here are today's progress photos

 This pantry is a new cabinet for us.  It is 15" deep and 36" wide from floor to ceiling.  Plus the above-the-fridge cabinet which is also an additional storage to what we had.

No comments: