This first picture is the wall from our counter to the patio door. The bare spot without tile is where a stand-alone base cabinet will be installed to add to the kitchen storage area and expand the kitchen.
This photo is of our kitchen entry and bedroom door area with the wall tile covering the old dark paneling.
We're loving it!
Tomorrow the tile will be grouted and a shelf built above these bedroom and kitchen doorways. After the grout is done the outlet and switch cover plates will be reinstalled and we are done with our kitchen. Thursday or Friday of this week they are supposed to come and install the glass doors on the display cabinets along the top.
It has been a disruption of normal activities but it has been a real pleasure to work with our contractor, Aarow Building of Columbia, MO.
No comments:
Post a Comment